The Problem

The Ear Video Studio in Zetland required a cooling solution to regulate the temperature in their studio space. Maintaining an optimal environment was essential to ensure the comfort of crew members and the smooth operation of recording equipment.

The Challenge

The client needed a reliable cooling system that could be installed quickly and provide efficient cooling for the studio. The solution also had to operate quietly to avoid disrupting recording sessions.

The Solution

We supplied and installed two 5kW portable air conditioners to meet the studio’s cooling needs. The units delivered consistent cooling performance, maintaining a stable temperature throughout the space. Their compact design and quiet operation made them ideal for the studio environment, allowing production activities to continue without interruptions.

The Ear Video Studio in Zetland required a cooling solution to regulate the temperature in their studio space.

The Problem

The Law College in St. Leonards experienced a complete air conditioning failure, leaving the entire building without adequate cooling. This created an urgent need for a temporary solution to ensure a comfortable environment for students and staff.

The Challenge

The client required multiple portable air conditioning units to effectively cool different areas of the building. The solution needed to be deployed quickly and operate efficiently to minimise disruption to the college’s daily activities.

The Solution

We supplied and installed multiple 5kW portable air conditioners throughout the building to restore cooling. The units were strategically positioned to provide even and consistent temperature regulation across various spaces. Their low-maintenance and efficient operation ensured a comfortable environment, allowing the college to continue its activities without significant interruption.

The Law College in St. Leonards experienced a complete air conditioning failure, leaving the entire building without adequate cooling.

The Problem

Thermo King’s office in Wetherill Park required a temporary cooling solution to address rising indoor temperatures, ensuring a comfortable environment for their staff and operations.

The Challenge

The client needed a reliable and efficient cooling system that could be installed quickly and operate effectively within an office environment, all while minimising disruption to daily work activities.

The Solution

We provided and installed a 6.5kW portable air conditioner to meet the office’s cooling requirements. The unit delivered consistent performance, maintaining a pleasant temperature throughout the space. Its easy installation and maintenance-free operation made it a practical solution for the client’s needs, ensuring minimal interference with office operations.

Thermo King’s office in Wetherill Park required a temporary cooling solution to address rising indoor temperatures, ensuring a comfortable environment for their staff and operations.

The Problem

The electronic room at Town Hall Railway Station in Sydney experienced an air conditioning malfunction, creating an urgent need for a temporary cooling solution to protect critical equipment from overheating.

The Challenge

The client required a quick and efficient cooling setup that could be deployed in a confined space without disrupting the station’s operations. The solution needed to provide reliable cooling to safeguard sensitive electronic systems.

The Solution

We installed a 5kW portable air conditioner to address the cooling issue in the electronic room. The unit was compact and powerful, ensuring consistent temperature control while operating quietly to minimise disruption. Its maintenance-free design made it an ideal choice for the station’s needs, providing immediate relief and protecting vital equipment.

The electronic room at Town Hall Railway Station in Sydney experienced an air conditioning malfunction, creating an urgent need for a temporary cooling solution to protect critical equipment from overheating.

The Problem

WiTH Collective faced an air conditioning breakdown in their conference room, creating an urgent need for temporary cooling to ensure a comfortable environment for meetings and events.

The Challenge

The client required a quick and effective cooling solution to maintain room temperature during the breakdown. The system needed to be easy to install and operate with minimal interference to ongoing activities.

The Solution

We supplied and installed a 6kW portable air conditioner to provide efficient cooling for the conference room. The unit was compact, easy to set up, and required no ongoing maintenance, making it the perfect temporary solution to restore comfort without disruption.

WiTH Collective faced an air conditioning breakdown in their conference room, creating an urgent need for temporary cooling to ensure a comfortable environment for meetings and events.

The Problem

White Lady Funerals and David Lloyd Funerals in Belmont, Newcastle, experienced an air conditioning failure, leaving their premises without adequate cooling. This created an urgent need for a temporary solution to maintain a comfortable environment for clients and guests during services.

The Challenge

The client required a reliable cooling solution that could be deployed quickly across multiple areas. The units needed to be efficient, easy to operate, and require minimal maintenance.

The Solution

We provided three 6kW portable air conditioners to ensure consistent cooling throughout the premises. The units were strategically placed to maximise airflow and temperature regulation. Designed for hassle-free operation, the air conditioners required no ongoing maintenance during the rental period, allowing the client to focus on their services without disruption.

White Lady Funerals and David Lloyd Funerals in Belmont, Newcastle, experienced an air conditioning failure, leaving their premises without adequate cooling.

The Problem

Wellbeing HQ in Belrose required a temporary cooling solution for their main hall to address rising temperatures during events and activities. Ensuring a comfortable environment for attendees was critical.

The Challenge

The client needed a solution that could deliver high-capacity airflow to cool the large hall effectively. The setup had to be quick, with minimal disruption to ongoing activities.

The Solution

We installed two 600mm diameter cooling fans in the main hall, providing powerful airflow to regulate the temperature efficiently. The fans were positioned to maximise circulation and ensure an even distribution of cool air across the space. Their ease of operation and maintenance-free design made them an ideal choice for the venue’s requirements.

Wellbeing HQ in Belrose required a temporary cooling solution for their main hall to address rising temperatures during events and activities.

The Problem

The Mazda Dealership at the West End required temporary cooling for their showroom during a two-day FM event. With increased foot traffic and warm conditions, maintaining a comfortable environment was essential for both attendees and staff.

The Challenge

The client needed an effective cooling solution that could accommodate the large space of the showroom and handle the demands of a high-traffic event. The setup had to be efficient and completed within a tight timeframe to ensure readiness for the event.

The Solution

We provided and installed two 5kW portable air conditioners and two 6.5kW portable air conditioners to effectively cool the showroom. The units were strategically positioned to maximise airflow and maintain a consistent temperature throughout the space. The portable air conditioners offered robust performance and required no maintenance during the event, ensuring smooth operation and a comfortable atmosphere for all attendees.

The Mazda Dealership at the West End required temporary cooling for their showroom during a two-day FM event.

The Problem

A wedding hall near Sydney required temporary cooling to maintain a comfortable atmosphere for guests and the wedding party. With a large gathering expected, ensuring consistent cooling throughout the venue was a priority.

The Challenge

The client needed a reliable cooling solution that could effectively cover the hall’s size and handle the heat generated by the event. The setup also needed to be discreet and completed promptly to avoid disrupting the wedding preparations.

The Solution

We provided three 5kW portable air conditioners to cool the wedding hall efficiently. The units were strategically placed to deliver optimal airflow and maintain a pleasant temperature throughout the event. Their quiet operation and maintenance-free design ensured uninterrupted comfort for all attendees.

A wedding hall near Sydney required temporary cooling to maintain a comfortable atmosphere for guests and the wedding party.